Dated sample — current status is not verified. This record is held from current briefings because its source may have changed, its check may be incomplete, or verification may have expired. The saved facts and qualifications below describe the stated review dates. Check the original source before acting.

Conditional awardSt Helens · North West

The Gamble - Main Works

Robertson is named for the proposed refurbishment and extension of The Gamble Building in St Helens town centre as a cultural and learning hub. The notice describes an approved pre-construction services agreement; the main build stage remains subject to final costing and negotiation.

01 / Project assessment

Why this project is relevant

Refurbishment and extension may warrant longer-term monitoring for access, welfare and small tools. No specific plant order, quantity or open equipment package has been verified.

Powered accessSite welfareTools & small plant

These are the hire categories YardBrief has matched from the published project scope.

02 / The source facts

What is happening

  • Main refurbishment of The Gamble Building
  • New extension
  • Repurposing as a cultural and learning hub with flexible social, educational and cultural spaces
  • Pre-construction services stage
Named contractor / developer
ROBERTSON CONSTRUCTION NORTH WEST LIMITED ↗
Company 12728498
Project stage
Conditional award
Proposed main works (ex VAT)
£12,500,000
Approved pre-construction stage
£736,646.55
Source contract / programme start
7 Dec 2026
Source notice
UK6 · 085079-2026
Notice published
8 Sept 2026
Last updated
63 days ago

What the timing means

The notice proposes signature on 15 October and programme dates of 7 December 2026–30 May 2028. These are conditional dates, not an imminent confirmed mobilisation.

Timing assessment: 13 Sept 2026. Contract dates do not confirm equipment delivery or an unfilled hire requirement.

03 / Before you contact them

Check these points

  • The £12.5m excluding-VAT figure relates to the anticipated main works programme. It is not a confirmed build order.
  • The approved pre-construction services agreement is £736,646.55. Final build costings and negotiation remain outstanding.
  • UK6 is an award decision notice published before contract entry. The notice gives a future signature date of 15 October 2026.
  • The 7 December 2026 start and 30 May 2028 end are proposed programme dates, subject to the remaining conditions.
  • No specific equipment hire requirement or open subcontract enquiry has been verified.
  • The contractor link is a general supply-chain application route, not a project-specific invitation to quote.
04 / Put the research to use

A practical next step

Review Robertson’s general supplier requirements if this fits your business. Treat The Gamble as a watch until the main works and programme are confirmed.

Changes worth watching

Check for a signed contract, final main-build approval or a revised programme. The history reviewed on 13 September contained the March tender and September decision; no later update was returned.

Assessment recorded 13 Sept 2026. These are points to check, not confirmation of a new project event or a buying invitation.

Check the official project history ↗