← All project examples

Dated sample — current status is not verified. This record is held from current briefings because its source may have changed, its check may be incomplete, or verification may have expired. The saved facts and qualifications below describe the stated review dates. Check the original source before acting.

Appointment reportedBurnley · North West

Tackling South-West Burnley Green Spaces Moto-nuisance - Phase 1

Burnley Borough Council has named Ground Inc for barrier works at Hargher Clough Park and other local green spaces. Work is proposed from 28 September to 27 November 2026.

01 / Project assessment

Why this project is relevant

Barrier installation may suit compact digging, compaction or small-tool suppliers. Equipment, attachments, quantities and whether the contractor already owns them are unknown.

Tools & small plantEarthmoving

These are the hire categories YardBrief has matched from the published project scope.

02 / The source facts

What is happening

  • Supply and fit vehicular barriers preventing access to green spaces
  • Hargher Clough Park and south-west Burnley sites
Named contractor / developer
GROUND INC LTD
Company 13666262
Project stage
Appointment reported
Published contract value (ex VAT)
£66,848.46
Source contract / programme start
28 Sept 2026
Source notice
UK6 · 085968-2026
Notice published
10 Sept 2026
Last updated
61 days ago

What the timing means

Signature is estimated for 25 September, with proposed works from 28 September to 27 November 2026 and an extension option. Contract entry and mobilisation are unconfirmed.

Timing assessment: 13 Sept 2026. Contract dates do not confirm equipment delivery or an unfilled hire requirement.

03 / Before you contact them

Check these points

  • UK6 gives planned signature on 25 September; no signed contract is established.
  • £66,848.46 excluding VAT is the works award, not a hire opportunity value.
  • Possible extension is two to four weeks; the precise sites and installation methods need checking.
  • No project-specific open equipment enquiry or unsatisfied hire requirement has been verified.
04 / Put the research to use

A practical next step

Qualify geography and the contractor’s equipment sourcing before considering a quote; the published award is a project signal rather than an equipment enquiry.

Changes worth watching

Check for contract entry after 25 September and any change to the proposed period.

Assessment recorded 13 Sept 2026. These are points to check, not confirmation of a new project event or a buying invitation.

Check the official project history ↗
Optional journey analytics: off. Your account works either way.