← All project examples
Contract enteredBurnley · North West

Property Refurbishment to 158 Oxford Road Burnley BB11 3HL

Burnley Borough Council records a signed contract with Mamad Home for refurbishment of 158 Oxford Road, BB11 3HL. The 24 September contract-details notice records a programme from 24 September 2026 to 8 January 2027.

01 / Project assessment

Why this project is relevant

Small tools and some access equipment are plausible, subject to the actual work scope and approach. No equipment requirement, order value or supplier invitation is verified.

Tools & small plantPowered access

These are the hire categories YardBrief has matched from the published project scope.

02 / The source facts

What is happening

  • Full house refurbishment at 158 Oxford Road
  • Notice lists potential pointing, gutters, wall treatment, re-roofing, kitchen extensions, plastering and rewiring
Named contractor / developer
MAMAD HOME LTD ↗
Company 12670520
Project stage
Contract entered
Published contract value (ex VAT)
£56,430
Source contract / programme start
24 Sept 2026
Source notice
UK7 · 090554-2026
Notice published
24 Sept 2026
Last updated
47 days ago

What the timing means

The 24 September UK7 records contract entry and a programme ending 8 January 2027, replacing the earlier 18 December award-stage end. This does not verify on-site progress or equipment delivery dates.

Timing assessment: 28 Sept 2026. Contract dates do not confirm equipment delivery or an unfilled hire requirement.

03 / Before you contact them

Check these points

  • UK7 records contract signature on 24 September; it does not confirm on-site mobilisation or an open hire requirement.
  • The £56,430 excluding-VAT refurbishment is modest; its hire element may be small.
  • The latest contract-details notice gives 8 January 2027 as the base end, replacing the 18 December end in the earlier award notice. A possible extension to 29 January is not the base programme.
  • The listed scope contains possible works; actual equipment needs, quantities and timing are unpublished.
  • The contractor website names Mamad Home Ltd but its footer also says Deluxe Renovation Ltd. Use the legal entity in the official notice.
  • The published contact form is a general customer enquiry route, not a project-specific buyer or invitation to quote.
04 / Put the research to use

A practical next step

Use the published general contractor contact to ask whether the modest refurbishment has any unfilled tool requirement and who handles it. This is not a supplier invitation or project-specific buying contact.

Changes worth watching

Watch for changes to the signed programme, scope or termination. The returned history now includes the 24 September contract-details notice.

Assessment recorded 28 Sept 2026. These are points to check, not confirmation of a new project event or a buying invitation.

Check the official project history ↗
Optional journey analytics: off. Your account works either way.